![]() ![]() Removing the water helps to reduce the weight of the sediment to haul, therefore lessening the impact on our roads. Once the sediment is removed from the pond the water will be taken out of it and put back into the pond before sending the sediment off-site. was chosen because it has the least amount of vegetation so that as little impact as possible would be made to the surrounding vegetation. Some vegetation will be removed from Forest St. will be closed in both directions for the duration of the project. and will enter the pond at that location. to the west, Crosstown Pkwy to the east, and Forest St. Sediment will be removed from Pond 1 which is bordered by Park St. When operating at their designed capacity, the Crosstown Ponds help to reduce the impact of rain storms lasting a full 24 hours with a total rain fall amount of 2.69 inches. This project is an operation and maintenance item to restore the Crosstown Ponds back to their original design capacity. This summer the City of Kalamazoo will be removing sediment from Pond 1 at the Crosstown Ponds as well as inspecting and cleaning the Axtell Creek Culverts. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |